[1]
Wang, Z., Lou, Y., Gou, B., Wang, R., Shafiq, U., Haris, M., Zhu, H. and Wang, L. 2025. Comparative modeling and optimization of CO2-ECBM processes using DP and MINC models. Subsurface Exploration and Exploitation. 2, (Dec. 2025), 1–11. DOI:https://doi.org/10.62813/see.2025.01.04.